My Sourcing

LanguageEnglish

Products

Services

Suppliers

Please enter a valid keyword with 2 or more characters / numbers.

ALBA Integrated Waste Solutions (Hong Kong) Limited 歐綠保綜合環保(香港)有限公司
ALBA Integrated Waste Solutions (Hong Kong) Limited 歐綠保綜合環保(香港)有限公司
Eco-Park
HKTDC Exhibitor

Eco-Park

Hong Kong

Others

Average Response Time

N/A

SUPPLIER INFO LAST UPDATED: 19 Nov 2020

ADVERTISE SINCE: 31 Jul 2018

Product Attribute(s)
Application:
WEEE Recycling (Air Conditioner, Refrigerator, Televisions, Washing Machines, Computers and Peripherals)
Description

位於屯門環保園的WEEE.PARK (廢電器電子產品處理及回收設施),佔地三公頃,標誌著特區政府實踐資源循環的決心,並為廢電器電子產品生產者責任計劃提供了所需的設施。


廢電器電子產品含有鉛、水銀及溫室氣體等有害物質,如不妥善處理或棄置,或會對環境和人體健康構成危害。WEEE.PARK是國際上先進的同類型設施之一,會採用先進工序,將「四電一腦」透過除毒、拆解和循環再造等工序,轉化為有價值的二次物料, 過程中就廢電器電子產品中的有害物質採取嚴格監控。


歐綠保綜合環保(香港)有限公司(歐綠保)透過公開招標程序獲得WEEE.PARK的設計、建造及營運合約。歐綠保是一家合資公司,由德國回收專家歐綠保集團及本地固體廢物管理專家綜合環保集團共同創立。合約營運期為10 年。


WEEE.PARK is a state-of-the-art Waste Electrical and Electronic Equipment (WEEE) treatment and recycling facility located on a 3-hectare site in EcoPark, Tuen Mun. It signifies Hong Kong SAR Government’s commitment towards sustainable use of resources and provides an essential infrastructure in support of the producer responsibility scheme (PRS) on WEEE (WPRS).


WEEE contains harmful materials such as lead, mercury and greenhouse gases, which may cause harm to the environmental and human health if not properly treated or disposed of. As one of the leading facilities of its kind in the world, WEEE·PARK adopts advanced technologies to turn regulated WEEE into valuable secondary raw materials through a series of detoxification, dismantling and recycling processes. Stringent control over hazardous components contained in WEEE is exercised in the process.


The contract to design, build and operate the  WEEE.PARK was awarded to ALBA-IWS following an open tender. ALBA-IWS is a joint venture company established by the recycling specialist ALBA Group from Germany and local solid waste management service provider Integrated Waste Solutions Group Holdings Limited. The contract operation period is 10 years.

You may also like