My Sourcing

LanguageEnglish

Products

Services

Suppliers

Please enter a valid keyword with 2 or more characters / numbers.

Da Vinci Bridge
Da Vinci Bridge
Production Lead Time:
45 day(s)
HKTDC Exhibitor
SabMatt Corp
Taipei City, Taiwan
Exporter, Manufacturer
Exporter, Manufacturer
Average Response time:N/A
This label indicates the credibility and capabilities of a supplier in 3 levels: Gold, Silver and Bronze.
SUPPLIER INFO LAST UPDATED: Sep 29, 2020
ADVERTISE SINCE: Nov 30, 2006
Product Attribute(s)
Model No.:
D-030
Brand:
Pathfinders, SabMatt
Colour:
Natural
Size:
9 x 4"
Port:
Taiwan
Type of Payment:
T/T
Minimum Order Quantity:
528
Major Material:
Wood
Age Group:
8-11 Years
Description
The Leonardo Emergency Bridge is finally here! Designed to be set up and removed quickly by armies (Lego armies for this bridge). This is a simple kit, yet elegant in design, and one of his many designs.
  • Size: 9 x 4 inches

You may also like