My Sourcing

LanguageEnglish

Products

Services

Suppliers

Please enter a valid keyword with 2 or more characters / numbers.

High Energy System
High Energy System
Production Lead Time:
90 day(s)
Haug (Far East) Ltd

Haug (Far East) Ltd

Hong Kong

Trade/Industrial Organisation

Average Response Time

N/A

SUPPLIER INFO LAST UPDATED: 31 Aug 2019

ADVERTISE SINCE: 31 Aug 2007

Product Attribute(s)
Model No.:
HBFE 06
Brand:
RÖSLER
Description
This High Energy System allows an extreme quick removal of the injection moulding joint and an optimal, stain-free polishing of injected temple and front parts (e.g. Grilamid and similar), ready for varnishing. Also the required processing media – plastic and ceramic chips – were especially developed for this use. Furthermore, this system is also very suitable for the treatment of titanium parts. The fine-grinding and polishing times were reduced by 10-30 times compared with those of the traditional treatment methods
in wooden barrels (dry) or standard vibrators.

 

You may also like