我的采购

请输入包含最少两个字元或数字的关键字。

高勋集团有限公司
查询

免责声明

本网页的连接可将阁下连往其他网址而阁下承认并同意,香港贸发局及其各联号公司对连接网址所提供的任何资讯的准确性或有效性,不负任何责任。

连接其他网址并不构成香港贸发局对该等网址或者该等网址所提供的资讯丶产品丶广告或其他材料的认可。

分享此页面
Excel GF241XL High Temperature High Pressure Yarn Dyeing Machine
分享此页面
生产所需时间:
120 日
品牌名称:
Gofront
颜色:
Standard
港口:
Hong Kong
付款方式:
L/C, T/T
最低订购数量:
1
是否可定制:
描述
联络供应商
描述
EXCEL GF241XL EXTRA LOW LIQUOR RATIO HIGH TEMPERATURE HIGH PRESSURE YARN DYEING MACHINE

- EXCEL GF241XL 超低浴比高溫高壓紗线染色機
 独创的、迄今为止全球耗水量最低的綠色低碳產品 
- EXCEL GF241XL Extra Low Liquor Ratio High Temperature High Pressure Yarn Dyeing Machine is the first and only one of its kind with low carbon emission 'Green Product' in the world. Another unique product from GOFRONT.

- 筒子纱染色浴比1:3,经轴染色浴比1:3.5-4.0.
- Liquor ratio for yarn in cones is 1:3; Liquor ratio for yarn in beams is 1:3.5 to 4.0.

- 耗水量≤45吨/吨棉纱,比传统染机节约68%以上  
- Process water consumption ≤45Ton/Ton yarn, over 68% savings compared with traditional machines.
                                      
- 耗电≤500千瓦时/吨棉纱,比传统染机节70%以上
- Electrical consumption ≤500 KW/Ton yarn, over 70% savings compared with traditional machines.

- 耗蒸气≤2.5-3吨/吨棉纱,比传统染机节约40%以上
- Steam consumption ≤2.5-3 Ton/Ton yarn, over 40% savings compared with traditional machines.

- 效率:8小时内/OWF8%由前处理氧漂至后处理,比传统染机提高产能25%以上
- Dyeing cycle for 100% cotton: within 8 hours with 8% dyes OWF (based on weight of fabrics) from the pre-treatment (scouring/bleaching) to post-treatment (dyeing/washing/softening), 25% less time compared with traditional machines.

- 专利设计的超低浴比高温脉流染色控制技术
- Patented design extra low liquor ratio high temperature pulsed flow dyeing control technology.

- 专利设计的超低浴比循环主泵
- Patented design low liquor ratio main circulation pump.

- 专利设计的纱杆及纱架底座
- Patented design spindle and carrier base.

- 载量范围由3kg-2347kg
- Capacity range available from 3kg to 2347kg in single kier.

- 综合节能(折算成标准煤):约400KG/吨纱
- Steam savings (based on conversion of standard coal consumption): around 400 kg/ton yarn or 0.4 kg/kg yarn.

- 设备投资回收期不超过一年;设备节能回收期12-18个月
- No more than 1 year can the investment be regained; equipment energy-saving recycling period is 12-18 months.

高勋集团有限公司

高勋集团有限公司

香港

制造商

您或许喜欢

确定要取消关注此供应商?