我的采购

请输入包含最少两个字元或数字的关键字。

Shenzhen Grande Electronic Co Ltd
查询

免责声明

本网页的连接可将阁下连往其他网址而阁下承认并同意,香港贸发局及其各联号公司对连接网址所提供的任何资讯的准确性或有效性,不负任何责任。

连接其他网址并不构成香港贸发局对该等网址或者该等网址所提供的资讯丶产品丶广告或其他材料的认可。

分享此页面
Industrial Power Supply PCB Assembly Service 1 oz Copper
分享此页面
描述
联络供应商
描述
Supplier: Shenzhen Grande Electronics 
Layers: 4
PCB:FR-4/1.6mm, 1oz finished copper 
Application: Industrial Power Supply PCB Assembly Service 1 oz Copper    
Surface Treatment: ENIG
PCBA Lead time:3-4 weeks 
Packing: Anti-static bag and compartmental packing 
Twist: <0.75% 


【Description】 
1, PCBA turnkey solution for Industrial Power Supply PCB Assembly Service 1 oz Copper  
2, PCB Assembly, PCB fabrication / PCB layout, PCB re-layout. 
3, Electronic Manufacturing Service. 
4, SMT&DIP&PTH&BGA. 
5, Components Sourcing. 
6, Quick PCBA prototype. 
7, X-ray test, the Internal Circuit Test (ICT) , Function Test (FCT) 
8, Sample and small batch order are accepted. 


PCBA Service 
Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing. 
Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping. 

PCBA Quality Assurance 
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 
2, 7 lines dust-proof SMT lines and DIP lines. 
3, All line workers wear anti-static and dust-proof clothing. 
4, All operators should pass strictly training before they start work. 
5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering and Semi-auto DIP 
6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray. 
7, PCBA Test:ICT, Functional Circuit Test and X-ray test. 
8, Package Processed: 
0402, 0603, 0805, 1206, 1608, 2125, 3216 
Micro QFP 0.2mm 
Flip-chip, BGA, Connectors 
BGA Ball Pitch=0.2mm 
9, Each workstation in accordance with the SOP 
10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on. 
11, Material Brand:KB, SHENGYI, NANYA and so on. 

PCBA Lead Time 
PCBA prototype: 7-10 working days after contract signed and EQ confirmed. 
Mass production: partial delivery according to the customer’s requirement. 

Shenzhen Grande Electronic Co Ltd

Shenzhen Grande Electronic Co Ltd

中国内地广东省

制造商

您或许喜欢

确定要取消关注此供应商?