我的采购

产品

服务

供应商

请输入包含最少两个字元或数字的关键字。

Hong Kong Integrated Waste Management Facilities, Phase 1
Hong Kong Integrated Waste Management Facilities, Phase 1
描述

Integrated Waste Management Facilities Phase 1 - Located at the Shek Kwu Chau site (to be reclaimed) to the south of Lantau Island, occupying and area of about 10 hectares

-  An Municipal Solid Waste (MSW) incineration plant with a maximum treatment capacity of 3,000 tonnes per day

-  A Mechanical Sorting and Recycling Facility with a maximum treatment capacity of 200 tonnes per day for recovery of useful resources from the mixed MSW.

香港贸发局参展商
Keppel Seghers - Zhen Hua Joint Venture
香港
其他
其他
平均回覆时间:不适用
供应商资料最后更新: 2020年11月19日
2018年7月31日登录于贸发网

您或许喜欢