My Sourcing

    Please enter a valid keyword with 2 or more characters / numbers.

    Hongkong Ervan Group Ltd
    Enquire
    Share this page
    LED 3/5/7/9/12/15/18W Recessed Ceiling Light Downlight or Spot Lamp ir 85-265V LED Downlight
    Share this page
    Production Lead Time:
    10 day(s)
    Model No.:
    R01CO
    Brand:
    ERVAN
    Colour:
    3000K~7000K
    Size:
    R145,R180,R240,R300
    Port:
    Shenzhen
    Type of Payment:
    T/T, L/C
    Minimum Order Quantity:
    5 piece(s)
    Voltage(V):
    AC100~277V
    Certification:
    CE, EMC, FCC, LVD, SAA
    Wattage(W):
    15W
    Warranty:
    5 year
    Light Source:
    SMD2835
    Body Material:
    Aluminum, Polycarbonate (PC)
    Is Dimmable:
    No
    Power Source:
    AC
    Including Bulbs:
    No
    Customized:
    Yes
    Description
    Contact Supplier
    Description

    Description:
    • 100% Brand New & High Quality!
    • High Power, energy saving compared to traditional halogen lamps!
    • Environmental protection and energy saving>80%.
    • Shockproof and damp proof, vibration and corrosion resistance
    • Environmentally friendly and recyclable.
    • optical PMMA light guide
    • AL6063-T5 Aluminium frame material: good dissipateion.
    • Wide application range
    • Safe power interface, easy to install and dismantle with clip.
    • More than 50,000hours average operating life.
    specification:
    • Luminous:1275lm ± 10%.
    • Luminous efficiency: 85lm/W.
    • Light source: SMD2835LED. 
    • Power efficiency: ≥0.92.
    • Power energy saving: ≥80%.
    • Power factor: ≥0.95.
    • THD:<20%
    • CRI: ≥80.
    •  
    Certification: TUV, CE,SAA

    Temperature and Humidity:
    • Operating temperature:-20~+40℃
    • Storage temperature:-40~+85℃
    • Operating humidity:10%-80%
    • Storage humidity:10%-80%
    Package:
    • Net weight:0.8g.
    • Dimension: r180
    • Packaging: 1pc/box, 10pcs/ctn.
    Installation:
    • Built-in the wall(standard installation)
    Payment: L/C, T/T.
    Package:
    • 7 days for sample
    • 20 days for mass production.
    Attention:
    • FYI: when LED tubes are replaced in a standard fluorescent tube batten, the starter must be removed, and replaced by the enclosed fuse, simply and conveniently.
    • FYI: electronic ballast must be by-passed by a registered electrician.

    HKTDC Exhibitor
    Hongkong Ervan Group Ltd

    Hongkong Ervan Group Ltd

    Hong Kong

    Exporter, Manufacturer

    You may also like

    Unfollow this supplier?