My Sourcing

LanguageEnglish

Please enter a valid keyword with 2 or more characters / numbers.

Shenzhen Grande Electronic Co Ltd
Enquire

Disclaimer

Some links on this website may take you to other third-party sites and you acknowledge and agree that HKTDC and the HKTDC Affiliates have no responsibility for the accuracy or availability of any information provided by those linked websites.

Links to other websites do not constitute an endorsement by HKTDC of such websites or the Information, products, advertising, or other materials available on those websites.

Share this page
Music Instrument PCB Assembly Service-Grande PCBA
Share this page
Production Lead Time:
14 day(s)
Description
Contact Supplier
Description

Supplier: Shenzhen Grande Electronics 

Layers: 6 

PCB:FR-4/1.6mm, 1oz finished copper 

Application: Music Instrument PCB Assembly Service-Grande PCBA  

Surface Treatment: ENIG

PCBA Lead time:3-4 weeks 

Packing: Anti-static bag and compartmental packing 

Twist: <0.75% 



【Description】 

1, PCBA turnkey solution for Analysis Instrument PCB Assembly Service- Grande PCBA.

2, PCB Assembly, PCB fabrication / PCB layout, PCB re-layout. 

3, Electronic Manufacturing Service. 

4, SMT&DIP&PTH&BGA. 

5, Components Sourcing. 

6, Quick PCBA prototype. 

7, X-ray test, the Internal Circuit Test (ICT) , Function Test (FCT) 

8, Sample and small batch order are accepted. 



PCBA Service 

Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing. 

Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping. 


PCBA Quality Assurance 

1, Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008 

2, 7 lines dust-proof SMT lines and DIP lines. 

3, All line workers wear anti-static and dust-proof clothing. 

4, All operators should pass strictly training before they start work. 

5, SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering and Semi-auto DIP 

6, PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray. 

7, PCBA Test:ICT, Functional Circuit Test and X-ray test. 

8, Package Processed: 

0402, 0603, 0805, 1206, 1608, 2125, 3216 

Micro QFP 0.2mm 

Flip-chip, BGA, Connectors 

BGA Ball Pitch=0.2mm 

9, Each workstation in accordance with the SOP 

10, Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on. 

11, Material Brand:KB, SHENGYI, NANYA and so on. 


PCBA Lead Time 

PCBA prototype: 7-10 working days after contract signed and EQ confirmed. 

Mass production: partial delivery according to the customer’s requirement. 


Shenzhen Grande Electronic Co Ltd

Shenzhen Grande Electronic Co Ltd

Guangdong, Mainland China

Manufacturer

You may also like

Unfollow the following supplier?