Sunfeel Pacific Limited
Please enter a valid keyword with 2 or more characters / numbers.
With 330mm apart perforations and each perforation covered by rubber sleeve as an open valve. High pressure by using double packers to grout (multiply) with different types of chemical mixtures. TAM grouting is a common technique for ground stabilization especially at soft ground before tunnel excavation.