My Sourcing

    Please enter a valid keyword with 2 or more characters / numbers.

    Xiamen PVTECH Corporation Limited
    Enquire
    Share this page
    T8 Hybrid LED Tube CCT Select (ETL)
    Share this page
    Production Lead Time:
    30-35 day(s)
    Description
    Contact Supplier
    Description

    T8 CCT Tunable Hybrid LED Tube

    1. Current leakage protection, passed UL1993 new standard(Review ID# 1993-2018-006)
    2. 3 in 1: Ballast compatible, single-ended ballast bypass, double-ended ballast bypass
    3. Safety: Constant power driver output when work with ballast, no LED board burn up issue
    4. Easy for stocking, reduce 66.66% inventory
    5. Shatterproof design: Meet NSF requirements
    6. CCT Tunable, Reducing your stock pressure.
    7. Automatic production, high product consistency and low manufacture costs
    8. Plug & Play direct
    9. Lifespan: 50, 000hrs
    10. Warranty: 5 years
    11. cULus/FCC/NSF/DLC

    HKTDC Exhibitor
    Xiamen PVTECH Corporation Limited

    Xiamen PVTECH Corporation Limited

    Fujian, Chinese Mainland

    Exporter, Manufacturer, Private Individual

    Average Response Time

    Within 24 hours

    You may also like

    Unfollow this supplier?