My Sourcing

    Please enter a valid keyword with 2 or more characters / numbers.

    Xiamen PVTECH Corporation Limited
    Enquire
    Share this page
    T8 Hybrid LED Tube CCT Select (ETL)
    Share this page
    Production Lead Time:
    30-35 day(s)
    Description
    Contact Supplier
    Description

    T8 CCT Tunable Hybrid LED Tube

    1. Current leakage protection, passed UL1993 new standard(Review ID# 1993-2018-006)
    2. 3 in 1: Ballast compatible, single-ended ballast bypass, double-ended ballast bypass
    3. Safety: Constant power driver output when work with ballast, no LED board burn up issue
    4. Easy for stocking, reduce 66.66% inventory
    5. Shatterproof design: Meet NSF requirements
    6. CCT Tunable, Reducing your stock pressure.
    7. Automatic production, high product consistency and low manufacture costs
    8. Plug & Play direct
    9. Lifespan: 50, 000hrs
    10. Warranty: 5 years
    11. cULus/FCC/NSF/DLC

    HKTDC Exhibitor
    Xiamen PVTECH Corporation Limited

    Xiamen PVTECH Corporation Limited

    Fujian, Chinese Mainland

    Exporter, Manufacturer, Private Individual

    You may also like

    Unfollow this supplier?