- Technology: FR4 CEM-1 CEM-3: Ni/Au, hot air leveling.
- More than double layer: HAL equal electroplating or chemical nickel/gold, hot air leveling (spray-tin), gold-finger plating, desmear.
- The production capacity (double to 10 layers).
- Two layer 10,000 to 15,000 square meter per month to more than four layers 6,000 to 8,000 square meter per month.