我的採購

請輸入包含最少兩個字母或數字的關鍵字。

Keppel Seghers - Zhen Hua Joint Venture
查詢
分享此頁面
Hong Kong Integrated Waste Management Facilities, Phase 1 【Video】
分享此頁面
描述
聯絡供應商
描述

Integrated Waste Management Facilities Phase 1 - Located at the Shek Kwu Chau site (to be reclaimed) to the south of Lantau Island, occupying and area of about 10 hectares

-    an Municipal Solid Waste (MSW) incineration plant with a maximum treatment capacity of 3,000 tonnes per day

-    a Mechanical Sorting and Recycling Facility with a maximum treatment capacity of 200 tonnes per day for recovery of useful resources from the mixed MSW.

The lighthouse design of the chimney has now been revised to a sailboat after considering comments from local communities and having consulted the HK Institute of Urban Design, the HK Institute of Architects, the HK Institute of Landscape Architects, and the HK Green Building Council.


香港貿發局參展商
Keppel Seghers - Zhen Hua Joint Venture

Keppel Seghers - Zhen Hua Joint Venture

香港

其他

您或許喜歡

確定要取消關注此供應商?