- Supplier: Shenzhen Grande Electronics
- Layers:4
- Application: Transport Temperature Control Systems Grande PCBA Manufacturing- China PCB Assembly Factory
- PCB: FR4/1.6mm/1oz Min Via: 0.2mm
- Surface Treatment: HASL
- PCBA Lead time: 3-4 weeks
- Testing: 100% E-test
- Standard Warp:<0.75%
[Description]
- Turnkey solution for Transport Temperature Control Systems Grande PCBA Manufacturing- China PCB Assembly Factory.
- PCB Assembly, PCB fabrication / PCB layout, PCB Reversing.
- Full Bespoke PCBA/ OEM/ EMS(Electronics Manufacturing Services).
- SMT&DIP&PTH&BGA.
- Components Sourcing.
- Quick PCBA prototype.
- X-ray test, ICT and Functional Circuit Test.
- Sample and small batch order are accepted.
PCBA Service Customer offers: Gerber file, PCB Specification, BOM and Assembly Drawing.
- Full-turnkey PCBA: 1-30Layers PCB, Components Sourcing, SMT, PCBA testing, PCBA Aging test, PCBA Packing and PCBA Shipping.
- PCBA Quality Assurance
- Certifications: UL, SGS, TUV, BV, ROHS, ISO9001: 2008, TS16949: 2008
- 7 lines dust-proof SMT lines and DIP lines.
- All line works wear anti-static and dust-proof clothing.
- All operators should pass strictly training before they start work.
- SMT Equipment:solder paste printer in Jidakang,, Mounter in Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
- PCBA Test Equipment: ORT, Constant temperature and humidity chamber,3D CMM,X-Ray.
- PCBA Test:ICT, Functional Circuit Test and X-ray test.
- Package Processed: 0402, 0603, 0805, 1206, 1608, 2125, 3216 Micro QFP 0.2mm Flip-chip, BGA, Connectors BGA Ball Pitch=0.2mm
- Each workstation in accordance with the SOP
- Materials:FR-4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM-1, CEM-3, FR-1, 94-V0 and so on.
- Material Brand:KB, SHENGYI, NANYA and so on.
- PCBA Lead Time PCBA prototype: 7-10 working days after contract signed and EQ confirmed.
- Mass production: partial delivery according to the customer’s requirement.
Other information for PCBA
- The mass production will be arranged after PCBA prototype confirmed.
- Use Teflon adhesive tape to protect Mount Holes and GND Holes.